๐Ÿ›‹๏ธ Madrid Sofa: BOM Simulation & Setup

This guide simulates how to fully define and structure a Madrid Sofa in CushionsERP using raw materials, sub-assemblies, and final BOMs.


๐Ÿ› ๏ธ 1. Define Raw Materials

These are the lowest-level components used in manufacturing (e.g., foam, fabric, zippers).

๐Ÿ“ Navigate to: Products/Services โ†’ New Product

๐Ÿ†• Create entries like:

  • ๐Ÿงฝ HR Foam 40D โ€“ Seat
  • ๐Ÿงต Fabric โ€“ Outdoor Grade A
  • ๐Ÿชก Polyester Thread
  • ๐Ÿ”— Zipper YKK 60cm
  • ๐Ÿ“ Velcro Tape
  • ๐Ÿ›๏ธ Plastic Bag (Rain Cover)

For each item, configure:

  • ๐Ÿท๏ธ Type: Product
  • ๐Ÿ›’ Nature: Purchasable
  • ๐Ÿ“ฆ Stock management: Enabled
  • ๐Ÿ“ Unit: e.g., meters, pcs, kg
๐Ÿงฎ *Tip: Reflect material loss directly in BOM quantities โ€” for example, add 5% extra to account for waste.*

โœ… 2. Define Sub-Assemblies (Components)

These are intermediate items assembled from raw materials:

  • Mattress Cushion
  • Back Cushion
  • Pillow
  • Rain Cover

For each:

  • Type: Product
  • Nature: Manufacturable
  • Stock Management: Enabled
  • Assign a BOM (see Step 4)

โœ… 3. Define the Finished Good

Create product: Madrid Sofa

  • Type: Product
  • Nature: Manufacturable
  • Stock: Managed
  • Selling: Enabled (if sold directly)
  • Unit: pcs

โœ… 4. Create BOMs

Go to: MRP โ†’ Bill of Materials Create a new BOM for each manufacturable item.

๐Ÿ“Œ BOM A: Mattress Cushion Quantity
HR Foam 40D โ€“ Seat 2 pcs
Fabric โ€“ Outdoor 3 m
Polyester Thread 50 m
Zipper YKK 60cm 2 pcs
*Apply 5โ€“10% loss if needed manually*
๐Ÿ“Œ BOM B: Back Cushion Quantity
HR Foam 40D โ€“ Back 1 pcs
Fabric โ€“ Outdoor 2 m
Polyester Thread 30 m
๐Ÿ“Œ BOM C: Rain Cover Quantity
Plastic Bag 1 pcs
Velcro Tape 2 m
Thread 10 m
๐Ÿ“Œ BOM D: Madrid Sofa (Final Assembly) Quantity
Mattress Cushion 1
Back Cushion 1
Pillow 2
Rain Cover 1
๐Ÿ” CushionsERP supports multi-level BOMs by referencing component BOMs in the final product's BOM.

โœ… 5. (Optional) Add Suppliers & Prices

For each raw material:

  • Go to Product โ†’ Suppliers
  • Add:
    • Supplier reference
    • Purchase price
    • Minimum quantity or delay (optional)

โœ… 6. (Optional) Create Manufacturing Order

Once BOMs are created:

  • Go to Manufacturing โ†’ New Order
  • Select Madrid Sofa
  • System calculates all components recursively
  • Execute the MO to deduct materials and add finished stock

โœ… Summary: Structure Modeled

  • ๐Ÿงฑ Raw Materials โ†’ Stock-managed, purchased
  • ๐Ÿงฉ Sub-Assemblies โ†’ Each with its own BOM
  • ๐Ÿ›‹๏ธ Finished Good โ†’ Final BOM uses subcomponents
  • ๐Ÿ’ฐ *Optional*: Supplier pricing, inventory links

โ†’ Next: Product Lot Number Guidance